Each mounting point is equipped with an independent lifting mechanism and a phase synchronization interface.

Normally, the Blackrock Block is housed inside heavy armor plates and is physically protected.

Once targeted by Chaos, or subjected to psionic attacks.

As the armor plates slid open, black stone pillars rose up, and obelisks stood atop the ship's ridge, instantly forming an "anti-psychic absolute domain" covering the entire ship.

Andy watched the simulation animation in STC.

The black hull, the rising obelisk, the invisible repulsive force field... tsk tsk!

This design was adopted to protect the precious black stone from being destroyed by physical artillery.

After all, while Blackrock is effective against psionic attacks, its physical strength isn't actually as formidable as one might imagine, and it can't withstand direct fire from a macro cannon.

But Andy must admit that there was some personal motive involved.

To be honest, he's really handsome!

An industrial, violent aesthetic filled with a sense of oppression and mystery!

In naval battles, appearance is also a part of combat power; it can demoralize the enemy!

"Although the first phase of the project is slow, as long as the keel is in good condition, the subsequent progress can be accelerated."

Andy wrote in his journal.

After all, the keel is the foundation.

With the foundation laid, construction will definitely be faster!

But the second phase of the project, which was scheduled to follow, also gave Andy a headache.

The theme of the second phase of the project is "organs".

The various functional compartments, energy pipelines, automated machinery, life support systems, and production facilities are filled inside the skeleton.

The complexity of this part, while slightly better than the first phase of the project, is still incredibly high.

The original "Wilderness Star" battlecruiser, as a warship deployed in the void for a long time, already contained a very complete industrial section inside.

But for Andy, that was clearly not enough.

Since the flagship was named "Victoria," it was clear that it was intended for colonization, plunder, and development.

It is not just a warship, but a miniature version of the Forge World.

Therefore, Andy made drastic and outrageous modifications to the internal structure.

The original "ammunition manufacturing area" has been expanded into a "comprehensive manufacturing center" that integrates a full range of production lines, including precision machining, stamping and forging, and final assembly and debugging.

The original "repair area" has been upgraded to a "construction center".

It possesses an independent large-scale engineering drone hangar and dry dock, and can even manually create artificial satellites, shuttles, and miniature fleets in the void.

The original "hydroponics farm" has been expanded three times and transformed into an "organic zone".

They not only grow vegetables, but also raise livestock, such as the Reiss Nest Masters they might raise in the future, as well as those responsible for the ship's organic chemicals and life support systems.

The number of partitions is three times that of the original version, and the pipeline density is more than five times that of the original version!

To fit so many things into the hull while ensuring they don't interfere with each other and can work together, Andy has been frantically studying white coupling lately.

He used the coupled field analysis software in the STC database to conduct an in-depth analysis of engineering cases from the Golden Age.

Then, he discovered a very interesting, even somewhat revolutionary, fact.

In the engineering terminology of the Golden Age, "white coupling" originally had two forms.

One type is PWC, which is pure white coupling, and the other type is HWC, which is heterogeneous white coupling.

The difference between these two concepts determines the hierarchy and maintenance logic of industrial products.

The so-called PwC is the concept that Andy had been misunderstanding all along.

For example, a knife.

In traditional manufacturing processes, the blade and handle are manufactured separately and then joined together using rivets and clips.

If they don't let you see the inside, it's a "black box"; if they let you open it up, it's a "gray box".

In PwC's manufacturing process, the blade and the handle are a continuous unit.

It is not only a physical continuity, but also a functional continuity.

The sensor is directly fused into the molecular lattice of the blade; the energy transmission lines are not buried inside, but rather the material itself possesses superconducting properties; and the heat dissipation channels are the microscopic pores within the material…

Speak plainly, there's no official business involved!

Just kidding, there aren't even any parts, so how can there be any tolerance?

Its performance is absolutely unmatched, its structure is incredibly advanced, and its energy utilization rate is almost 100%!

The core components of the "Sentinel" electric rifle that Andy had previously handcrafted were actually close to this state.

However, pure-blood white coupling has a fatal weakness.

Unrepairable!

If the blade of this knife is chipped, it cannot be repaired.

Because it can't be disassembled!

They are a unified whole; a change in one part affects the whole.

To repair it, it must be thrown back into the STC or rebuilt from scratch.

For a weapon, it doesn't matter; if it breaks, just replace it with a new one.

But this is unacceptable for vehicles.

If the focusing lens of a starship's main gun breaks on the battlefield, does that mean the entire warhead has to be rebuilt?

If an impeller of a water circulation pump explodes in deep space thousands of light-years away, does the entire life support system have to be cut off just because the impeller cannot be replaced?

unreasonable!

Therefore, during the golden age, when "white coupling" was mentioned, it usually referred to HWC.

Andy had always thought he was researching PwC, and it was only in the last two days that he finally solved the case.

The core idea of ​​HWC is to implement extreme white coupling within modules, pursuing high performance and high integration.

However, standard physical interfaces and pipeline connections are retained between modules and made into gray boxes to pursue maintainability and interchangeability.

For example, a pump set where the pump body itself is white-coupled, with the impeller, motor, and sensor integrated into one unit, boasts unparalleled performance.

However, this pump body is connected to the pipeline network via a standard flange and data interface.

If the pump breaks down, simply unscrew the flange, throw away the broken pump, and replace it with a new one.

That's how the term "heretic" came about; it's actually a compliment.

Although it undermines the perfect philosophy of white coupling’s “unity” and introduces the “interface” as a gray area representing inefficiency and failure.

From an engineering perspective, however, this is the most perfect solution.

It enjoys the high performance and size advantages of white coupling, while retaining the logistical convenience of modularity!

The second phase of the "Victoria" project also fully adopted the HWC scheme.

All functional areas are modularized!

The manufacturing area is a large module, each production line within it is a medium module, and each section of automated machinery is a small module.

The module is highly integrated, so any kind of cutting-edge technology can be used.

However, modules must be connected through standardized, universal interfaces!

To address this, Andy specifically designed an interface standard.

It includes parameters in twelve dimensions, such as energy transmission, data exchange, fluid transport, and mechanical fixation, and these parameters must be enforced.

Even if you try to incorporate condensation technology, you still need to use an adapter to make it conform to the standard.

"The focus of the second phase of the project is to build these modules and lay these interface networks."

Andy mentally reviewed the construction plans.

To be honest, this is a little more difficult than simply piling on materials.

Because extremely high precision control is required, the boundaries of each module also need to be strictly defined.

That's why Andy needs so many senior engineers. If he were to draw out all those millions of interfaces by himself, his brain would break down.

As for the third phase of the project, it's simply about filling in the gaps in this pre-built framework.

Simply install the existing facilities, and you're done!

Home renovation work, the easiest way!

……

Once the ship is built, it will definitely be used to move.

Where did they run off to?

First, we'll explore other great spots in the Colonus expansion area. Once we've reached a certain level of prestige, we'll head for the Halo sector!

Once there, the obvious course of action was to colonize, farm, and expand!

Andy retrieved the Planetary Colonization Guide from the STC database.

This is a Standard Operating Procedure (SOP) from the golden age.

Although the details may vary depending on the colonization target (such as whether robots or living people are deployed), the general process is the same.

Andy quickly glanced through it.

Phase 1: Telemetry and Site Selection.

Using deep space scanning arrays, we search for planets located in the habitable zone.

Analyze atmospheric composition, gravity parameters, and geological stability.

Phase Two: Orbit Control.

Deploy satellite networks to establish a global communication and monitoring system.

In a hostile environment, an orbital defense platform must also be deployed.

Phase Three: In-situ Resource Utilization (ISRU).

This is the most crucial step.

You can't expect to get everything off the mothership.

We must first deploy basic in-situ units, using local materials and resources to establish the first outpost.

Phase Four: Ecological Restoration.

If the atmosphere is unsuitable for breathing and the soil is toxic, then air purifiers and soil-purifying bacteria should be introduced.

If the technology is not up to par, this will be a long process, often taking years or even decades.

However, with advanced technologies such as transcription furnaces, this process can be shortened to a few months.

Phase 5: Energy and Industrial Network.

Deploy fusion power plants and establish an industrial mother machine matrix.

[Sixth Stage: Population Transmission and Socialization.]

Thaw the colonists and rapidly increase the population through reproductive technology.

Establish urban, legal, and educational systems.

Finally, there's the time estimate.

For a standard, undeveloped planet (no atmosphere/weak atmosphere), establishing a self-sufficient industrial colony takes an average of 10-30 years.

"too slow."

Andy mentally gave his assessment.

10 to 30.

He's only been in Zais for less than a year, and he's already caused such a stir.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like