The weapon tycoon who traveled to Daqin
2174 processing overtime
"With enough steel, urban construction can further develop. Liberalism is what we need." Shang Wen then said.
"Qin Kingdom needs cities, you can look at the entire Western Regions, as well as the Hexi Corridor, and the northern region." Shang Wen stood up and held a pen to draw on the map.
"In these areas, there are no big cities at all, and the population is not enough to gather. This situation is very bad for us." Shang Wen said to Meng Yi.
"In the next step, the government is to collect some cities in the railway and the regional selectivity of trade. In this way, Qin Kingdom can completely control the above areas." Shang Wen said to Meng Yi.
"Well." Meng Yi nodded to agree to agree with Shang Wen's thoughts. Before Shang Wen had such ideas, this idea is even more determined, but it is right to think about it.
More and more conditions are mature, which allows Qin Guo to have the conditions for building large -scale cities. Shang Wen also thinks so when such conditions are met.
"Building a city, we still wait a little. After all, there are still some conditions that are immature. When we are mature, it is when we are popular at a large scale." Meng Yi said to Shang Wen.
"Yes, the first is that the railway construction must keep up with the pace of the times." Shang Wen nodded and agreed.
And on the construction site of the Southern Xinjiang. United Railway Company in the Western Regions of the Qin Kingdom.
"Your railway engineering progress is not very fast." Wang Zhao worriedly watching the Western regions on the company was working. Although these people had worked very hard. However, in the face of huge engineering projects, such driving is still not enough.
"There is no way. There are too few people. Although the materials are enough. However, this person has too few hands. No one, I can't speed up the progress." Li Ming said embarrassed.
He personally sleeps only four hours a day, but his engineering volume is very large. Counting the mileage, it will exceed more than 7,000 miles. But he has only 7,000 slaves and railway workers of more than 1,500 people.
In such a big engineering project, he is really incompetent.
"Oh. This is not possible. This railway construction is related to national defense construction. If you do not speed up the progress of the project, we will not be able to strengthen the defense." Wang Zhao said.
"Chief, we also know this, but helplessly, our current people are very lacking. This should be clearer than us. Moreover, this slave is consumable.
"Li Ming said.
"Can't replenish people, and the progress of the project is very tight. I can't help it." Li Ming said.
"I'm upset." Wang Zhao shook his head and said.
"Okay. You can listen. You will have it, but your project progress will be accelerated. Otherwise, it is not good for anyone. If you practice it as soon as possible, don't worry about the slaves." Wang Zhao said.
"So, can the slave in my hand ignore it?" Li Ming asked. He asked like this is actually a way to speed up the project.
There are still some engineering supervisors like him. I heard that they also have certain slaves in their hands, but they have completed faster. The reason is that they do not hesitate to slavery. The slaves are divided into three shifts.
, But there are very many time points for overtime. For example, when the two shifts are handed over, it takes an extra hour and a half of the previous class. In this way, the engineering speed suddenly speeds up a lot. The slaves have no time to rest at all. Overtime overtime.
It has become normal. And such engineering intensity, the consumption of slaves is very great. Many slaves are exhausted and exhausted. Many slaves are exhausted alive when laid rails.
The consumption is very large, but it is not replenished. Although the project speed is a lot faster, the more the project is slowing down. The reason is naturally caused by the big consumption of slaves.
Workers from recruiting workers. Their labor intensity dare not increase, because they have the nature of labor immigration, they are protected by the laws of Qin State. The work intensity dare not mention it at all.
"Well. Maybe. I don't know how long those slaves will arrive, but I think this year should be able to solve the part." Wang Zhao said.
"Oh." Li Ming didn't get the answer he wanted, and he didn't dare to process overtime. Other people could do this on the construction site, but the speed of the later period slowed down a lot. He was unwilling to see such a speed
Drag it, so I dare not do so.
"I know your engineering speed is the slowest among all engineering teams." Wang Zhao said to Li Ming at this time.
"You cherish the labor force in your hands, and the idea may be right, but don't forget. The special weather here, the weather here is much faster than the Mainland. I just remind you, this is the Western Regions.
It cannot be constructed. Although the death of slaves will reduce the speed, your project progress will be accelerated. As for slaves, I think there will be a lot of solutions. I just hope that you can consider the progress of the project. "Wang Zhao said to Li Ming.
"Yes, the chief. I will speed up." Li Ming nodded admitted.
"Okay. Very good, just say it." Wang Zhao nodded.
"I hope I can see that a railway can be repaired as soon as possible. If that, your slave will be very sufficient." Wang Zhao said with a smile. Then he got on the horse and went to the next site to inspect the construction site to inspect and go to inspect the construction site to inspect and go to inspect the next site to inspect and go to inspect the construction site to inspect and go to inspect the construction site to inspect and go to inspect the construction site to inspect and go to inspect the construction site to inspect and go to inspect the construction site to inspect and go to inspect the construction site to inspect and go to inspect the construction site.
It's.
"Huh." Li Ming exhaled at this time.
"Zhang Shun." Li Ming shouted loudly.
"Zhang Shun, Zhang Shun, hurry up and give it to me." Li Ming shouted a little anxiously.
"Come. Here. I'm here." Hearing his boss shouted loudly, Zhang Shunfei ran to Li Ming's following.
"Head. What's the matter?" At this time, Zhang Shun asked with a smile.
"Starting today, work overtime, regardless of the death of the slave, the speed must be accelerated." Li Ming ordered.
"Ah. But." Zhang Shun was a little hesitant.
"Don't care so much. There are many slaves. Someone will add to us at that time. Do you worry about these?" Li Ming asked dissatisfied at this time.
"Okay, head, I understand. I started working overtime and lifted the speed up." Zhang Shun nodded. Although there were some things I didn't understand, Zhang Shun still decided to speed up the process. After all, the main person in charge here is Li Ming.
, Not himself.
You'll Also Like
-
Hogwarts: This Dark Lord is so evil
Chapter 199 3 hours ago -
Astral Cockroach
Chapter 532 3 hours ago -
Enter at the beginning to reach the semi-holy level and summon two great gods and demons
Chapter 680 3 hours ago -
Reborn to dominate technology
Chapter 1166 3 hours ago -
From Baron to Lord
Chapter 926 12 hours ago -
Future Beast World: Pampered by beautiful women, many children and good fortune
Chapter 548 12 hours ago -
Simulating The Cultivation Of Immortals, I Reached The Nascent Soul Stage In Ten Days!
Chapter 255 18 hours ago -
In Konoha, I collected corpses on the battlefield for ten years
Chapter 349 19 hours ago -
I picked up skill fragments in the demon world
Chapter 596 22 hours ago -
Villain: Don't play cards according to the plot, and the heroine who quits the marriage at the
Chapter 729 23 hours ago