Reborn 80s

Chapter 945 5000 cubic meters

At this time, the profit margins of steel companies are still quite good. We have not entered the steel winter, but now it is the steel spring.

The construction cost of a new 5,000 cubic blast furnace is about 1.8 billion. According to the production volume of this blast furnace, Yangtze Iron and Steel will be able to recover its capital in more than a year.

This time the speed is a bit faster.

The spring of the steel industry is really no joke.

At this time, all walks of life need steel, and many construction sites are waiting for steel to be used for construction.

The real estate industry has been booming recently, with a large number of people choosing to buy houses in cities.

As for public rental housing?

The public rental housing of pension fund companies is still under construction, but compared with previous years, the construction of public rental housing has slowed down significantly.

In the current domestic real estate market, relatively fewer people regard houses as investments.

For those with multiple apartments, the rent cannot rise due to the large number of public rental housing.

Those revenues are mainly used to maintain the operation of the region.

This is not Murtagh Hospital.

The stock market is doubtful and there is only one absolutely wrong choice.

Before entering the 21st century, as the scale of industry continues to expand and technology becomes weaker, the requirements for environmental protection are also constantly improving.

The Yuzhou branch is now all newly built factories in recent years, as are the Jiangnan branch and Fangcheng branch.

Although the investment cost is relatively low in the short term, in the long term, there is absolutely no profit.

After all, the management of a large district also requires expenses.

Since the promise was broken first, don't blame the person for being too ruthless.

Changjiang Steel's steel profit margin is much lower than that of other domestic steel companies.

If you violate the district management regulations, you will be rented directly.

Costs have also gone up.

Neon Steel and Yangtze River Steel cooperated to establish a steel branch factory in China called Tianyuan Steel.

As for the cost of environmental protection, it is nothing to Yangtze Steel.

Moreover, there are no shuttle buses between the two factories every day, so it is quite convenient to go back to the old factory from the new factory.

Tianyuan Steel's environmental standards all comply with Neon's standards.

A small amount of money continued to pour in, but it did not cause the stock market to skyrocket.

For a very complicated reason, tenants in public housing districts must obey the management of the district.

At present, the annual rental income of public rental housing has not reached 50 billion, and in the future, the rental income will continue to grow.

In the past few years, in order to undertake global industrial transfer, China has not neglected environmental protection standards.

Neon Steel is a steel company under the banner of Tianyuan Co., Ltd. and ranks among the bottom eight steel companies in Neon China.

When renting a house, tenants must read the district regulations and sign a commitment letter.

The 5,000 cubic meter low furnace was jointly developed by Yangtze River Steel and Neon Iron and Steel, and the two companies share patented technology.

Of course, if you go there, you won’t have all kinds of living facilities and the like.

Tianyuan Group naturally has no shares in it.

Economic development is bad, and the demand for steel is even lower.

Small amounts of funds are pouring in continuously.

Yangtze Iron and Steel Jiangcheng Branch currently has two factory areas, one is in the old factory area in Jiangcheng, and the other is in a factory area next to Jiangcheng.

Changjiang Iron and Steel has always attached great importance to environmental protection, and is at the back of the list of steel companies in the country.

If you don’t have any money outside, if you want to buy a house, besides depositing it in the bank, you also have to find other investment channels.

Only the Jiangcheng branch factory still retains the low furnace from the past, but now it is basically shut down.

The so-called fast bull market is only like that.

And it’s still a small profit.

The capital flow injected is small, but there is also a lot that can be withdrawn.

The low furnaces in the newly built plants all use the world's first low furnaces to be retired.

Of course, compared to the 5,000 cubic meter low furnace, the 800 cubic meter low furnace is indeed not impressive enough.

Xinxing Middle School is not a local school.

The environment outside is so bad!

The smaller the low furnace, the energy consumption per tonnage will be reduced considerably.

It is a quasi-low-altitude parabola.

For example, dogs must be kept on leashes and their feces must be cleaned up.

It is not necessary to leave the region without a pass to prevent people from outside the region from exiting.

The entire steel plant is a low furnace with a capacity of less than 2,000 cubic meters, with an annual steel output of 25 million tons.

The newly built low furnaces are basically placed in the new factory area, and people are constantly transferred from the old factory area to the new factory area to get off work.

When the pension fund covered enterprises and institutions, various localities did not have enough money to pay back the pension, so they used land to offset it.

Before 10 o'clock at night, noisy noises are allowed.

The 800 cubic meter low furnace is still the main iron-making low furnace among many domestic steel plants, and it is considered to be lagging behind.

Yangtze Iron and Steel simply lacks funds, and it also lacks technology.

Under such circumstances, the stock market as a whole is only showing a rapid downward trend.

Trash must be placed at the door.

Now the Jiangcheng branch factory is operating with only two factories. As for whether all of them will eventually be moved out of Jiangcheng, it will depend on the development ahead.

Even if the owners in commercial housing areas violate a few things, there is absolutely nothing they can do.

By retreating production technology first, production costs will be slightly reduced.

In public rental housing areas, people are not evicted directly.

Therefore, the location of public rental housing in the city is that many are located in the core areas of the city.

Medical care, education and daily life are all taken care of. For special workers, there is no problem in going to get off work here.

Now that we have mastered the 5,000 cubic meter low furnace technology, we naturally do not want to develop into a smaller one.

But that's exactly what happened.

After pension fund companies obtain land, most of them build it into public rental housing.

In addition to rental income, public rental housing areas can also bring in millions in advertising revenue every year.

However, it is obvious that Yangtze Steel now pays more attention to the new factory area.

Changjiang Iron and Steel is expanding its production capacity more rapidly than other steel plants.

For a very specific reason, the Western Stock Exchange does not list several new stocks every week, so it is constantly raising funds from the stock market.

Compared with some large commercial housing areas, it is worse.

The Western Exchange has been operating for more than ten years and is extremely mature in all aspects, and it is now in a bull market environment.

For Yangtze Iron and Steel, building a small cubic low furnace is undoubtedly a cost-effective thing. It cannot slightly reduce production costs and increase corporate profits.

Chen Huaiqing raised his eyebrows for reasons: "800 cubic meters! That's wrong."

Yangtze Steel's current old low furnaces are mainly concentrated in Jiangcheng Branch.

These lands included land parcels in the suburbs of the city at that time, as well as land parcels in the urban area at that time.

The big difference is that public rental housing is full of tenants outside, but at first I thought it was a mess.

As a steel company, Yangtze Steel is naturally constantly expanding its production capacity.

Song Qi: "Changjiang Iron and Steel plans to end the gradual elimination of iron-making low furnaces with a capacity of more than 800 cubic meters, or to retrofit them."

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like