However, for a power supply station, this is a fatal blow. A sudden surge in power and current in a short period of time can burn out the transformer. This is why large facilities are equipped with dedicated power supply stations and equipment, specifically to withstand such surges.

When new equipment was added here, a dedicated power supply was set up, but since it hadn't been used for a long time, we couldn't just let the equipment gather dust! So we connected the power supply to the new supporting factories from here.

Now that this environmental protection equipment has been connected to the existing factory, its power is constantly increasing.

A staff member at the power supply station who was monitoring power grid fluctuations saw a peak in the power output on the computer screen, and he immediately panicked because it was noon, which is usually the peak time for electricity consumption.

Even if the power increased by thousands of kilowatts, it wouldn't have been a big deal, but now it's tens of thousands of kilowatts, creating a linear increase in power output.

The power consumption increased by one-tenth compared to usual. This is a huge fluctuation for an industrial park where latency is measured in milliseconds and dual power supply system switching ensures stability.

He quickly ran out to inform the director: "Director, the power consumption is rising rapidly. Is it possible that some machines in the park have started up without notifying us? The power consumption there is increasing rapidly, and our oil-cooled transformer will soon be unable to handle it. Aren't those machines not connected to our power supply station, but connected to another system?"

These statements are not wrong, because many of those things use other power systems; they are only responsible for some small factories in the surrounding area.

"Is the machine broken? I'll go take a look." Shang Dongfeng ran straight to the control room. The peak power was now 20,000 kilowatts higher than before, which was equivalent to 20,000 users plugging in a kettle to boil water at the same time.

The fluctuations are huge, and the transformer can't withstand the pressure inside. What happens if the pressure inside is too high? It will explode.

"We need to investigate quickly to find out which power line is experiencing a surge in electricity consumption and cut it off as soon as possible, otherwise the factories in the industrial park will be in trouble."

This statement is not an exaggeration, because many factories in the industrial park cannot withstand power outages. For example, in some reactions, if the power goes out in the middle of the process, there will be no finished product, the raw materials will be lost by hundreds of thousands, and the reaction vessel will have to be cleaned afterwards.

The reactor needs to be cleaned specially, and it can't be finished in less than a day.

We definitely can't start construction right away, but all of this costs money!

Just then, the computer screen went black, and all the electrical appliances stopped working, which meant that the transformer had exploded and they had no power.

"Have you found the relevant lines?" Shang Dongfeng asked. If they hadn't found the relevant lines, then it would just mean adding another power system to the system that would explode.

Fortunately, this kind of investigation is not easy, and it was found in less than half a minute.

"Found it, it's main cable number 01, and it's been cut now."

"Switch to the second power system immediately."

All the power supply station staff began to coordinate the power supply system of the second transformer, and power was successfully restored 30 seconds later.

Now this is another high-power appliance and

Transformers and expansion tanks

""