After lunch, Liu Yan and Dilina began assembling the steam engine.

Qin Chuan also participated. Although the construction technique could generate parts, assembling such delicate work still required manual labor. Moreover, Qin Chuan needed to use the construction technique to make fine adjustments in some places.

The assembly area is located on the open space to the west of the yard.

Qin Chuan used his construction skills to create a steel base frame. The frame was 1.5 meters long, 80 centimeters wide, and 30 centimeters high. All the components of the steam engine would be mounted on this frame.

The first step is to install the boiler.

The boiler is the largest component. It is a cylindrical steel container, 60 centimeters in diameter and 80 centimeters in height. The bottom is the firebox, the middle is the water chamber, and the top is the steam collection chamber.

Qin Chuan and Dilina worked together to move the boiler to the left side of the base frame and secure it with bolts.

A square firebox opening was cut into the bottom of the boiler, allowing firewood to be added from the outside. Above the firebox was an iron plate, and above that was the water chamber.

"Let's add water to the water chamber to test the seal first," Dilina said.

Qin Chuan brought over a bucket of water and poured it into the boiler through the water inlet on top.

After the water was poured in, the three of them carefully examined the boiler.

There was no leakage, and all welds and interfaces were completely dry.

The boilers created by construction techniques have better seam sealing than the welding techniques used on Earth. This is because the metal created by construction techniques is formed in one piece, and there are no weld seams at all.

"Perfect." Dilina patted the outer wall of the boiler with satisfaction.

The second step is to install the cylinder.

The cylinder is fixed to the right side of the base frame and connected to the boiler by a steel pipe. One end of the steel pipe is inserted into the steam outlet of the boiler, and the other end is inserted into the air inlet of the cylinder.

The interface was sealed using construction techniques. Qin Chuan created a thin metal ring on the inside of the interface, which fit tightly against the outer wall of the pipe.

Liu Yan checked the pipe connections.

"The interface is robust and well-sealed."

The third step is to install the piston and connecting rod.

Liu Yan took the piston component from the table and carefully inserted it into the cylinder.

The piston slid smoothly down the cylinder wall to the bottom.

The piston rod extends from one end of the cylinder and aligns with the round hole at one end of the connecting rod.

Qin Chuan used a pin to secure the piston rod and connecting rod together. The pin was fabricated on-site during construction; it was the perfect size and fit perfectly after being inserted.

The other end of the connecting rod is connected to the crankshaft. It is also secured with a pin.

The fourth step is to install the crankshaft and flywheel.

The crankshaft is mounted on two bearing housings in the base frame. The bearing housings are also made of steel, and the inner walls are ground to reduce friction.

Qin Chuan placed the crankshaft on it and turned it twice by hand to test it.

The crankshaft rotates smoothly in the bearing housing without any abnormal friction noise.

The flywheel is mounted on one end of the crankshaft. A steel disc weighing over 50 kilograms is fixed to the shaft with keyways and keys.

Qin Chuan gripped the edge of the flywheel and spun it around forcefully.

The flywheel started spinning with a hum, and with great inertia, it spun several times before slowly coming to a stop.

"The flywheel's inertia is good." Dilina observed the flywheel's rotational speed decay. "It spins freely for about fifteen seconds, which means the bearing's coefficient of friction is very low."

Fifth step: Install the exhaust system and safety valve.

A pipe is connected to the cylinder's exhaust port to vent the steam generated after the work is done. The end of the exhaust pipe is bent upwards to prevent rainwater from flowing back in.

The safety valve is installed on top of the boiler. Qin Chuan made a counterweight safety valve consisting of a valve seat, a valve core, a lever, and a 15-kilogram iron block.

Dilina installed the safety valve herself. She first screwed the valve seat onto the pre-drilled hole on the top of the boiler, then inserted the valve core, and finally placed the lever and counterweight on top.

The weight of the iron block presses the valve core onto the valve seat, forming a seal.

"alright."

Dilina stepped back and inspected the entire system.

The transmission links of the boiler, cylinder, piston, connecting rod, crankshaft, and flywheel, as well as the exhaust pipe and safety valve.

All the parts were in their proper places, and it looked quite presentable.

Liu Yan stood next to the steam engine, hands on her hips, her black T-shirt clinging to her body in the wind, highlighting the distinct outline of her chest.

"At least from the outside, this is already a complete steam engine. Whether it can turn on depends on the test run."

Qin Chuan walked around the steam engine.

The dark gray steel components reflected a cold, hard luster in the afternoon sun. The boiler was robust and sturdy, the cylinders were delicate and compact, and the flywheel was large and heavy.

The entire steam engine was roughly the size of a large wardrobe.

This was the culmination of two days' hard work by Liu Yan and Dilina, plus one day's worth of parts production by Qin Chuan.

The other people in the camp gradually gathered around.

Yang Mimi squatted down next to the steam engine and reached out to touch the outer wall of the cylinder.

"This is a steam engine? It looks so complicated."

Keiko Kitagawa circled the flywheel once.

"What's the purpose of this big wheel?"

Lin Shishi stood to the side, her hands clasped in front of her, watching quietly.

Liu Yifei moved closer, her gaze wandering among the various parts.

"Liu Yan, what is the approximate transmission efficiency?"

Liu Yan tilted her head and did some calculations: "The theoretical thermal efficiency is about 20%. Steam engines aren't very efficient to begin with. But it's more than enough for our current needs."

Mina carried the wild boar she had hunted that day into the camp. Seeing a group of people gathered in the yard, she ran over in a few quick steps.

"What's all this commotion?"

"The steam engine is about to be tested," said Keiko Kitagawa, clapping her hands.

Mina put the wild boar down on the ground and walked over to the steam engine to take a look.

"This thing looks pretty powerful."

"Let's test drive it," Qin Chuan clapped his hands.

Liu Yan and Dilina exchanged a glance, both of them looking a little nervous.

Theory is one thing, actual operation is another. No matter how perfect the design drawings are or how excellent the assembly skills are, you only know if it will work after you start the fire.

Dilina took a deep breath: "Brother Chuan, fill the boiler with water first."

Qin Chuan brought over two buckets of water and poured them into the boiler through the water inlet on top. When the water level reached two-thirds of the boiler's height, Dilina called out, "Stop!"

"That's enough. Too much water means not enough steam space. Too little water will damage the boiler if it's left to burn dry."

Liu Yan had already prepared the firewood. The dry firewood was chopped into small pieces and neatly stacked under the firebox.

"ignition."

With a thought, Qin Chuan activated the Heaven-Burning Blaze.

The firewood in the firebox was instantly ignited. Orange flames leaped up, licking the iron plate at the bottom of the boiler.

"Now wait for the water to boil." Dilina stared at the temperature indicator on the top of the boiler. It was a thin, curved copper tube filled with half a length of mercury. Changes in the mercury level could roughly indicate the temperature inside the boiler.

The mercury column is slowly rising.

Everyone fell silent, staring intently at the steam engine.

Three minutes later, a slight noise came from the boiler.

Glug, glug.

The water has boiled.

Steam began to accumulate above the boiler. A wisp of white steam seeped slightly from the joint in the pipe between the boiler and the cylinder.

"There's been a slight leak." Liu Yan frowned.

"It's alright," Dilina waved her hand. "A small leak won't affect operation. We can have Brother Chuan fix the seal when it's officially in use."

Steam continued to accumulate.

The pressure inside the boiler is slowly increasing.

Qin Chuan could hear the hissing sound of steam flowing in the metal pipes, which grew louder and louder.

Suddenly, a dull "thump" came from the cylinder.

The piston was propelled by steam!

The connecting rod moved slightly, causing the crankshaft to rotate half a turn.

Driven by inertia, the flywheel slowly rotated half an arc.

Then it stopped.

"Exhaust valve!" Liu Yan shouted.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like