First flight of the second joint flight

Mid-January 2016.

After numerous flight and landing tests, most of the data related to LY-5 has been collected.

All problems that could be exposed in the body structure at low speeds have been investigated and resolved.

Based on this, Wang Bing decided to start the second phase of testing.

A week later, a brand-new, fully upgraded LY-5, based on the collected data, successfully rolled off the production line.

Unlike the test prototype, this LY-5 is equipped with four ZK-33F full-flow staged combustion cycle rocket engines.

Of the four engines, three are placed at the three vertices of an equilateral triangle, and one is placed at the center of the equilateral triangle.

The LY-5 was launched as part of the rocket's third stage into its designated orbit.

This launch method is significantly different from the previous US method of launching space shuttles, which required the space shuttle itself to provide thrust throughout the entire launch process.

For the LY-5 itself, it only needs to provide the specific impulse and thrust required for itself when entering orbit.

This eliminates the need for a high-thrust rocket engine in the LY-5, and also reduces the amount of propellant it carries.

This allows for more space to be allocated for drivers and passengers within a limited area.

During the return and landing phase, aerodynamic deceleration is first achieved through unpowered gliding.

Once at a suitable altitude, it uses one of the central engines to provide power for climbing and deceleration, thus completing the entire flight path.

It's similar to skipping stones.

Once the LY-5 enters powered control mode, the pilot can control it in a manner similar to flying an airplane and perform landing and recovery operations.

This is why Wang Bing values ​​the RD-33 turbofan engine so much.

只不过稍有些可惜的是4台RD—33无法让乾重22吨的LY—5进入到3至4倍音速的状态。

The good news is that the four RD-33 engines can provide 33.2 tons of thrust when afterburner is engaged, which is very close to the 30 tons of sea-level thrust of the ZK-33F.

Therefore, the data collected during this period is still very valuable for reference.

The following day, with the help of large engineering machinery, United Industries' first manned spacecraft was successfully secured to the top of the non-CBC configuration United 2.

On the morning of January 26, the prepared Joint-2 Y1 combination began its transfer procedure.

Meanwhile, United Industries officially released an announcement on its website.

They are about to officially enter the field of manned spaceflight.

At 9:00 a.m. on January 28, carrying the hopes of all United Industries employees, the United-2 Y1 carrier rocket, carrying three dummies, successfully ignited and lifted off.

To facilitate operation, the ignition sequence of the nine ZK-308 engines has also been adjusted.

Unlike the previous simultaneous ignition, this time the ignition method has a clear sequence.

倒计时5秒时,外围8台发动机中编号为A2、A4、A6、A8合计四台同时点火。

倒计时2秒时,外围剩下的编号为A3、A5、A7、A9四台发动机同时点火。

With one second left in the countdown, the engine in the middle, numbered A1, successfully ignited.

As the countdown reached zero, the throttle valves of the nine engines quickly opened, unleashing 2520 tons of sea-level thrust, thus successfully lifting the 2100-ton assembly into the air.

The crackling roar of the nine engines sounded like firecrackers.

Even with numerous soundproofing and vibration reduction measures in the flight control center 5 kilometers away, Wang Bing's ears still felt painfully vibrating.

I reached out my little finger and rubbed my ear, but the tinnitus didn't improve.

"I should have worn headphones," Wang Bing said with some regret.

This situation only improved when the rockets were no longer visible to the naked eye in the sky.

Turning his head to glance at Lin Yu, who was engrossed in the roar of the rocket, Wang Bing subconsciously picked at his ear again.

Affected by the engine noise, Li Ran, who had come over, unconsciously raised his voice a little: "Great! It didn't explode on the launch tower!"

"The most dangerous phase is over, and it looks like the maiden flight should be successful." Wang Bing's voice was a little loud when he answered, "It's just that..."

We'll see if LY-5 can withstand it.

Unlike Lin Yu's confident demeanor, Wang Bing was somewhat worried about the condition of LY-5, a sentiment Li Ran understood.

After all, this aircraft was developed under the leadership of Wang Bing, and it is intended for human use.

If he, as the person primarily responsible, isn't worried about his own work, then there's something wrong with him.

Fortunately, the final result did not require much waiting from everyone.

At T+00:03:10, at an altitude of approximately 80 kilometers above the ground, the first-stage engine shuts down.

Subsequently, the first and second stages separated successfully, and the second stage engine, designated B10, ignited successfully.

Since this launch mission is the maiden flight of the Joint 2 rocket, Lin Yu does not plan to conduct a recovery test.

The first-stage rocket, having exhausted its fuel, began to freefall and crashed into the designated sea area.

Once the sea had calmed down, the salvage vessels that had been waiting in the distance quickly headed toward the wreckage.

After dispersing several foreign vessels that were there to watch the spectacle, the salvage operation proceeded smoothly.

At T+00:03:50, the fairing was successfully jettisoned at an altitude of 140 kilometers above the ground.

T+00:07:08, Secondary engine shut down.

Soon, the spacecraft will separate from the rocket, and the second-stage rocket will burn up in the atmosphere.

At this moment, LY-5 successfully reached a near-Earth orbit at an altitude of 280 kilometers.

In order to successfully reach the mission orbit at an altitude of 400 kilometers where the space station is located, LY-5 began subsequent operations.

万众瞩目之下,编号为C11、C12、C13、C14的四台ZK—33F」发动机顺利点火,开始提升轨道高度。

T+00:09:47,四台发动机提供的速度增量加上地球自转提供的线速度增量成功让LY—5来到了高度为400千米的任务轨道。

Subsequently, the engine was shut down, and the LY-5 began ecological environment monitoring and airtightness checks.

Soon, the LY-5, having successfully collected data, opened its back section, exposing the payload bay inside to the space environment.

Immediately afterwards, several companion satellites successfully separated from LY-5 via the transmission mechanism and began to orbit LY-5 to take pictures.

The ground also received first-person perspective images transmitted back by the accompanying satellite.

All that could be seen in the footage was a several-meter-long, snow-white mechanical arm extending from the LY-5 module, swinging back and forth toward Earth as if waving hello.

Upon witnessing this scene, thunderous applause erupted in the flight control center. Li Ran even stood up and clapped vigorously until his hands turned red.

Several tens of minutes later, LY-5 closed the previously opened payload bay door, but in Li Ran's opinion, this action might be more accurately described as a roof.

As air is backfilled, the atmospheric pressure inside the payload compartment slowly rises.

Once the pressure inside the payload compartment reached the predetermined value, LY-5 initiated ecological environment checks and airtightness checks again.

At 3:27 p.m., after shaking off its companion satellite LY-5 and undergoing multiple orbital maneuvers, it successfully rendezvoused with Tiangong.

For safety reasons, LY-5 was positioned between Earth and Tiangong, approximately 10 kilometers directly below Tiangong.

LY-5 even opened its payload bay again, revealing its robotic arm, which swayed and waved to the astronauts.

The Shenzhou-12 crew successfully captured images of LY-5 alongside Earth using a high-definition camera through a small window in the sleeping area.

At 4:13 p.m., LY-5, having completed all scheduled tests, began preparations for its return.

With the assistance of the RCS, the LY-5 successfully completed the turn, and all four engines were ignited simultaneously to begin deceleration.

After five and a half laps of deceleration, the altitude dropped to 120 kilometers, and the speed of LY-5 also decreased significantly. Soon, the re-entry phase began.

At 23:06 in the Eastern Time Zone 8, a crimson meteor streaked across the sky over Northern Europe from northwest to southeast with a strange trajectory.

Approximately 86 minutes later, the LY-5 entered the country's airspace, where three J-10 fighters that had been circling nearby quickly engaged afterburners to surround and escort it.

Following the LY-5's maneuvers, which involved frequent shifts between overweight and weightlessness, even seasoned pilots found it difficult to keep up.

Fortunately, the speed of the LY-5 decreased rapidly, and by the time it approached the Sichuan border, its speed had dropped to subsonic.

Upon entering the Sichuan region, three J-10 fighters appeared in the sky and began a handover and escort flight.

The three J-10 fighters that were originally responsible for escorting the LY-5 began their return flight. During the return journey, one of the pilots turned his head and looked into the distance, staring at the LY-5 that was getting further and further away.

Lost in thought: "Can a person actually sit on this thing?"

At this moment, the North Suburb Airport, which already had very few takeoffs and landings, was completely cleared out, and all non-essential personnel were evacuated.

Dozens of fire trucks stood by with their lights flashing, and not far away was the longest runway of the North Suburb Airport.

Illuminated by several searchlights, it was the brightest star in the darkness.

Forty-five minutes later, a roaring sound came from the sky in the northwest direction.

At this moment, LY-5, having exhausted all its propellant, returned to its homeland.

As the altitude decreased, the LY-5, which was in a state of unpowered gliding, experienced a slight increase in speed.

As the landing procedure begins, the tricycle landing gear starts to lower.

Main landing gear opens normally.

Front landing gear, opening is correct... no, front landing gear opening failed!

The baffles used to protect the landing gear and fairing have deformed due to high temperatures and cannot be opened!

Upon hearing the announcement over the loudspeaker, the firefighters who were on standby immediately became highly alert.

Under the watchful eyes of everyone, the LY-5's powerful flight control system successfully brought the two rear main landing gears to the ground first.

Then the front abdominal area begins to come into contact with the ground and rub against it.

A two-kilometer track stretches from one end to the other.

With sparks and lightning streaking along the way, the LY-5 finally came to a successful stop on the two-kilometer runway.

Dozens of fire trucks started up simultaneously, surrounded the area, and sprayed water to cool it down.

Under the pitch-black night, the LY-5, after being burned at high temperatures, looked even blacker.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like