Nominal: Parachuted into Handong Province at the start
Chapter 404 He went to that vocational education park again.
It was already evening when we got back to the provincial capital.
Lin Weimin did not go home; he went directly to his office.
He sat at his desk, flipped through the materials for the two red projects again, and wrote a line in the blank space on the page about Shimengou Village.
"The village's water source is surface water, which is easily polluted. It is recommended to switch to deep groundwater."
Pipeline laying should avoid rock formations; burying it along rural roads could reduce construction difficulty.
The funding gap will be addressed by the provincial government, with the county responsible for implementation; water supply must be operational by the end of the year.
After finishing writing, he handed the materials to Xiao Zhou, asking Xiao Zhou to make copies and distribute them to relevant leaders and departments, and to come up with a solution within a week.
The next day, he went to the vocational education park again.
The park is located on a vacant lot in the suburbs, covering several hundred acres. It is planned in a grand manner, with teaching buildings, training buildings, a library, student apartments, a canteen, and a sports field. However, most of the buildings have only completed their main structure, and the exterior walls have not yet been painted. The red bricks are exposed, the scaffolding has not been removed, and the rusty steel pipes gleam with a dark red light in the sunlight.
The construction site was deserted, with few workers in sight. Only a few old men guarding the gate were playing cards in the gatehouse, the sound of cards slamming onto the table echoing across the empty site.
The windows of several teaching buildings that have already been topped out have not yet been installed. The dark windows are like countless empty eyes, staring blankly at the sky, at the new urban area under construction in the distance, and at the high-rise buildings that are rising from the ground.
The person in charge of the park was a man in his early forties surnamed Zhao. He was wearing a wrinkled jacket, his hair was messy, and his eyes were bloodshot, as if he hadn't had a full night's sleep in a long time.
He stood next to Lin Weimin, holding a thick report in his hand. The corners of the report were curled up from flipping through it, but Lin Weimin did not take it. He just asked him to talk about where the problem was, where the bottleneck was, and whether the bottleneck was due to insufficient funding or incompetent personnel.
Zhao, the person in charge, opened his mouth, wanting to say a lot, but after organizing his thoughts for a long time, he could only sigh and point to the empty teaching buildings in the distance.
"Secretary Lin, money is not the biggest problem. The biggest problem is that this project has been delayed for too long, so long that the original plan is no longer suitable for the current needs."
We want to adjust the plan, but adjusting the plan requires going through procedures, which takes time. If the time is delayed, the construction unit can't wait, and if the construction unit leaves, the construction site will stop.
Restarting a project after it has stopped is harder than starting a new one, because the original contracts need to be changed, the original materials need to be dealt with, and the original workers need to be reorganized. This back-and-forth process takes another year.
Lin Weimin stood in front of the windowless teaching building, looking up at the dark, empty windows.
The edges of the window are uneven, some due to construction errors, and some due to later vandalism. Bricks have fallen off the window and broken into pieces on the ground, and wild grass has sprouted from the gaps between the broken bricks, its green color shining brightly.
The wind howled through the windows, as if the building was crying, crying for its wasted youth, for the workers who had toiled here, and for the children who should have been studying here but went elsewhere.
"I'll coordinate the planning."
The relevant provincial departments jointly approve the application, handling it as a special case without any bureaucratic approval process. The application is approved in one meeting, and the results are available within a week.
You are responsible for the construction company's issues.
If the original contract cannot be fulfilled, it shall be terminated in accordance with the law, and a new tender shall be issued.
The construction schedule must be reversed, quality must be guaranteed, and safety must be the top priority.
This park can't be delayed any longer. We've already let this land down, and we can't let down the children who will study here in the future.
Zhao, the person in charge, had reddened his eyes, but he didn't let the tears fall. He just blinked hard a few times to force back the moisture.
He pulled a pen from his pocket and quickly scribbled in the blank spaces of the report. The pen tip moved swiftly across the paper, and the handwriting was so illegible that only he could read it. But he didn't need to look at the words; they were already in his mind and etched into his bones.
After returning to the provincial capital from the vocational education park, Lin Weimin convened several coordination meetings to study the progress of the yellow progress projects one by one.
For projects lacking funding, he coordinated with the Finance Department to increase the budget;
For projects lacking policy support, he coordinated with relevant departments to introduce supporting measures;
For projects lacking coordination, he personally called the responsible comrades in the relevant cities and counties to make sure everything was clear, to ensure that the responsibilities were properly assigned, and to resolve any problems before they escalated.
Each coordination meeting is short, at most an hour, but each hour resolves a number of issues, removes obstacles, and advances a number of projects.
Sha Ruijin and Li Dakang also participated in several of the coordination meetings. The three of them sat on one side of the conference table, opposite the heads of relevant departments and cities and counties.
Lin Weimin sat in the middle, with Sha Ruijin on his left and Li Dakang on his right.
He was stern and didn't talk much, but every word he uttered hit the nail on the head, making the person opposite him sweat and those around him understand what was going on.
In mid-April, the drinking water project in Shimengou Village resumed construction.
With the special funds allocated by the province in place, the county reorganized the construction team, optimized the design plan, changed the water source from surface water at the foot of the mountain to deep groundwater, and laid the pipelines to avoid the rock strata and along the rural roads.
The construction site was bustling with activity as the workers worked with great enthusiasm. Under the old locust tree at the village entrance, the elderly people would sit on their small stools every day, watching the workers, watching the pipes extend section by section, and watching the faucets be installed in each household.
The old woman who was picking vegetables went to check on it every day. As she looked, her eyes would redden. She would wipe her eyes with the back of her rough hands and mutter, "It's almost here, almost here."
An elderly woman next to her asked her what was coming soon. She pointed to the construction site in the distance and said, "The water is coming soon, the water is coming soon, the water will be at my doorstep soon."
In early May, the planning adjustment scheme for the vocational education park was approved by the provincial authorities. A new construction company entered the site, and the roar of machinery and the shouts of workers echoed across the construction site once again.
The exposed red brick teaching buildings began to be painted, the scaffolding was re-erected, and the workers, wearing safety harnesses, busied themselves on it, like a group of ants climbing a giant tree.
Zhao, the person in charge, stood at the entrance of the construction site, looking at the lights that had been turned on again.
This time, tears streamed down his face, leaving two thin streaks that were dried by the wind, then flowed again, and were dried by the wind once more.
At the end of May, water was connected to Shimen Gou Village.
When clear tap water gushed from the faucet, the old woman picking vegetables scooped up a handful, tasted it, and then smiled. Her wrinkles smoothed out, as if the sky, which had been overcast for a long time, had finally cleared up.
Her son called from out of town and asked what she was doing. She said she was getting water; the tap water was working now, and it was sweet, much sweeter than well water.
The son remained silent for a long time on the other end of the phone, and then said something that the old lady remembered for a long time.
"Mom, you're living a good life."
When the old lady told her neighbors what she had said, her eyes were red, but the corners of her mouth were turned up. The smile and the tears were both on her wrinkled face, and no one could tell which was which.
You'll Also Like
-
I didn't use any cheat codes in this other world, I'm sure of it!
Chapter 942 6 minute ago -
Starting from the Elden Ring
Chapter 276 6 minute ago -
My harem is indescribable
Chapter 241 6 minute ago -
Taking Nazarick to the world of Rimuru
Chapter 251 6 minute ago -
The dragon-slaying hero eventually becomes a silver-haired dragon girl.
Chapter 125 6 minute ago -
Death God: I use my DNF clone to be the mastermind behind the scenes.
Chapter 310 6 minute ago -
In name only, where did the Han University gang come from?
Chapter 609 6 minute ago -
Now that everyone's in Old Money's class, who still treats them like real young masters?
Chapter 151 6 minute ago -
Becoming stronger when you're single? You can't imagine how happy I am!
Chapter 399 6 minute ago -
The opening analysis of M78 reveals that the Trisolarans are so frightened they've become dehyd
Chapter 187 6 minute ago